← All case studies

Hotel transformation

Courtyard Inn

How a wireless BAS retrofit turned a stalled cost-reduction effort into $75,000 in annual savings — paid back in under 60 days.

$75,000

Actual annual savings

$30,000

Rebates secured

<60

Day payback period

The challenge

A hotel that had run out of easy wins.

After exhausting all readily available cost-reduction options, the management team engaged RecessD to evaluate a wireless Building Automation System (BAS) solution.

The installation

Three weeks of planning, one efficient rollout.

The proposal development required three weeks of preparation. The installation carried a price tag of $40,000, which was substantially offset by $30,000 in available rebates — a net cost of just $10,000. Energy conservation was estimated at $58,000 annually.

The deployment proceeded efficiently, with wireless controls and monitoring devices distributed throughout the facility. Equipment that had previously operated continuously transitioned to optimized schedules:

  • HVAC units
  • Exhaust fans
  • Pool heater and pumps
  • Conference room controls
  • Vestibule heaters

The results

Results that beat the projection.

The net investment was recovered in under 60 days when accounting for rebates received. Measured results exceeded projections, delivering $75,000 in annual energy reductions — well above the original $58,000 estimate — while also reducing anticipated maintenance expenses and meaningfully enhancing the property’s market value.

Could your building be next?

Tell us about your equipment and we’ll estimate your savings.

Contact us See more case studies